Healthcare Facilities
| Project Name | Services Provided |
| Memorial Hermann Southeast Hospital Jay Atkins P.E., Director of Engineering Services |
Environment of Care, Consulting Services Upgraded Patient rooms, cosmetic renovation ADA Consulting Services for off campus MRI Upgrades to all patients’ room rest rooms Construction of two ADA restrooms in Main hospital lobby Fire/ smoke damper inspection and repair Helicopter landing Bern buildup and structural support to avoid soil erosion Emergency Room renovation, approx. 7000sq.ft Fire/Smoke damper repairs and replacement throughout the hospital |
Images: (click on thumbnail to see larger image) ![]() |
|
| Methodist Diagnostic Hospital Tom Harbour, Manager of Engineering |
Safety Management Consulting Services |
| San Jacinto Methodist Hospital (Alexander Campus, Garth Rd. Campus, Decker Campus) Chris Siebenaler, Chief Operating Officer Richard Vera, Director of Facilities Management |
Central Plant Upgrades JCAHO Consulting Services Safety Management Consulting Services Life Safety Evaluation and necessary corrections Cooling Tower Repairs Convert Patient room restrooms to ADA compliance Upgrades to all Medical Gas piping system Install new underground drain lines (150’ long) for all Kitchen equipments Installed new (Custom fabricated) Air Handler Unit in Skilled Care unit Parking Lot Painting Built seven (7) ADA restrooms and shower for Skilled Nursing Facility Piping and Meter installation on Cooling Tower for sewer credits Steam pipeline replacement on Boilers Insulation of all Chilled Water lines (Supply & Return) Build out of Performance Improvement offices Installation of high pressure steam boilers |
Images: (click on thumbnail to see larger image)![]() |
|
| East Houston Regional Medical Center Terry Scott, Facilities Management Director |
Addressed Life Safety issues prior to JCAHO survey Exterior and Interior Painting project Designed and calculated Retention Pond requirements for flooding issues Stucco repairs to building exterior |
| West Houston Regional Hospital Henry Maneago, Director of Engineering |
Upgrades to main Hospital Bus Duct and change secondary taps Install new Fire Hose Cabinet in Parking Garage and insulate Fire riser lines Prepare Hospital for JCAHO survey Repair to Sterilizer drain lines in Surgery Install new carpet and paint Craft room Install blow-down valve to Boilers Paint Helicopter pad and fencing Provided consulting services for Medical gas dew point control Fire, Fire Smoke damper repairs and replacement throughout the hospital Installation of Water Softener Upgrades to Medical Air system Natural Gas line inspection and testing Vestibule installation to save HVAC Paint entire parking lot (3 floors) |
Images: (click on thumbnail to see larger image) ![]() |
|
| St. Joseph Hospital James Mathew, Director of Engineering |
Insulation of all ductwork and utility piping in Mechanical Room (11 AHU’s) Sealing of Mechanical room and room conditioning to prevent condensation Cleaning of all chilled water coils, fins and interior of AHU’s Insulate all three hi pressure boilers and related steam lines Fogging of plenum space in Cancer Research lab and monitor air quality Life Safety evaluation, and audit all EC documentations and make recommendations Testing of high pressure Boilers for NoX emission Installation of new Water Softener Labeling and tagging all Utility System valves and pipelines Preparation of Statement of Condition (SOC) JCAHO Consulting work Installation of eight (8) cell, 10,500 GPM Cooling tower Build – out of Heli-stop on garage Conducted Fire damper Safety inspection per JCAHO requirements |
| TOP | |
| Diagnostic Clinic of Housto Dorma L. Kohler, Chief Executive Officer |
Conducted Energy Management studies for Lighting and Boiler use Implemented Preventive Maintenance program Performed Indoor Air Quality studies Implemented Safety Management program Brought Clinic in compliance with all Life Safety issues Designed air filtration device for all Mechanical Rooms Provided Leadership to Engineering to Dept. in the absence of Director Conducted Safety class for Physicians and staff |
| Triumph Hospital Bill Astley, Director of Engineering |
Renovated Physical Therapy department ICU renovation Cosmetic upgrade to entire floor (30 Beds) Remodeled Doctors office- 3500 sq. ft Widened entryway to hospital, redesigned driveway Installed new Medical Air system Sanitized and cleaned Cooling towers Converted Helicopter landing pad to parking |
| Cardiology and OBGYN, MOB build out Dr. K. Reddy, President and CEO |
Ground up, build out of a 14,000 Sq. ft. Medical Office Building
Project cost $2.2 million |
| Images: See Project Spotlight » | |
| TOP | |
| Ben Taub Hospital Anzar Hasan, Director of Engineering |
Cooling tower repairs Painting of entire parking garage (8 storey) Installation of Safety UV light source in Air Handler Units Conducted Life Safety audit throughout the building for SOC compliance Installed new flooring in main lobby areas Installed stainless steel trough under glass acid pipe lines |
| Memorial Hermann Baptist Hospital David Longnion, Admistrative Director |
Reconstruction of entire hospital after taking a direct hit from Hurricane Rita Conducted Safety training for over 100 contractors Implemented Interim Life Safety Measures and Infection Control Risk Assessment Served as interim Safety Officer for the past four (4) months |
| Select Specialty Hospital (Heights Campus), (Medical Center Campus), (Spring Branch Campus) Brock Hardaway, Regional Vice President Ed Hubbard, Director of Facilities Management |
JCAHO consulting services Cooling Tower Repairs Life Safety Evaluation and necessary corrections Demo of Incinerator Fire/Smoke Damper repair & inspection Construction of Doctors Sleep Room Nurses Station renovation Assist with OSHA inspection follow-up Energy Management Studies |
| TOP | |
| Renal Access Center of Houston Dr. Pedro Frommer & Dr. Freemu Varghese |
Design – build out of 5500 sq. ft Renal Access Center |
| Preferred Dental Care Dr. V. Sam, Dentist |
Design – build out of Dental Clinic- 5225 sq.ft |
| Endocrinology & Metabolism Clinic Dr. Eric A.Orzeck MD, FACP,FACE |
Design – build out of 5000 sq. ft Doctors Clinic |
| Kingwood Medical Center Anzar Hansan, Director of Engineering |
AHU Preventive Maintenance Replace Parking light Pole Recessed Can Lights Corian Counter Top Convert ICU to Day Surgery Oxygen line for Hyperbaric Chamber Hot water heater upgrade Survey and seal Building exterior for Pest entry points Ceiling Grid & tile installation Consulting for Pest entry points Liebert Unit for MRI Concrete pour by emergency entrance. Provide Licensed Journey man Electrician Top up Freon in Roof top unit Cleaning of Cooling Coils of Roof top unit Replace filters of all Roof top unit Quarterly PM of all Roof top unit Stainless Steel Corner Guards for Patient room doors OR Painting Fabrication and installation of Signs Millwork in Nurse's Station Re-routing of Ductwork in Kitchen Re-upholster Recliners Water Well Replace Commodes in Patient Rooms Furnish & Install Air Compressor & Dryer Signs for parking lot Reinsulate TRANE Chillers |
| TOP | |
Need a quote? Fill out our online RFQ form or call (713) 777-6666 today and experience the OnePoint difference for yourself.